UNIVERSITY OF MARYLAND, COLLEGE PARK |  SCHOOL OF ENGINEERING |  DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING
 

 

ABOUT US |  STATUS OF CENTER |  LINKS |  CONTACT US    

           
 
RECENT PROJECTS
Development of The Engineering GIS/Database Document Organization System (GDOS)
Health Monitoring of the New High Performance Steel Bridge on MD 140 over MD 27
Testing and Selection of Concrete Mix Design for Fast-track Full Depth Repair of Concrete Pavements
DC Sign Management Systems
Bridge Management Decision Support
FRP bridge deck
Research for the Sign Bridge Program
Decision Making to Damaged Pole
Vehicle Collisions with Highway Bridges
Heavy Truck Configuration on the National Bridge
Allocation of User Costs on Bridge Structures
Maryland Legal Vehicle Weight Limits
Weigh-in-Motion (WIM) for Bridge
Site Specific Algorithm for the Steel Girder Optimum Design
 
PREVIOUS PROJECTS
Study Projects Conducted
Forensic Projects
Design and Analysis Projects
 
FIELD TESTIING
MD 24 FRP Deck Replacement Project
Load Test Report
MD140 over MD27 HPS Project
 
    MD 24 FRP Deck Replacement Project


Please click on any picture to enlarger.

1st deck on Applying compound at joint Deck lifting
 

 

4th deck on Partially completed deck Deck placement skewed end
 

 

Grinding for gauge installation Strain gauge on steel stringer Strain gauge on FRP
 

 

Monitor Open traffic while testing Bridge in completion

 
Load Test Report
BRIDGE NO. 12016  
ON MD-24 OVER DEER CREEK  
(FRP BRIDGE DECK REPLACEMENT)  
 
  See the Load Test Report
 
 
       
 [RETURN TO TOP]
 
UMD Logo  University of Maryland, College Park, MD 20742  |  PHONE 301.405.2011  |  FAX 301.314.9129
 Copyright 2004 University of Maryland.  Contact us with QUESTIONS AND FEEDBACK
 Last modified Wed Jul 26 11:32:51 EDT 2006.

  

Click it to go to homepage